arrow_back_ios

Main Menu

See All Acoustic End-of-Line Test Systems See All DAQ and instruments See All Electroacoustics See All Software See All Transducers See All Vibration Testing Equipment See All Academy See All Resource Center See All Applications See All Industries See All Insights See All Services See All Support See All Our Business See All Our History See All Our Sustainability Commitment See All Global Presence
arrow_back_ios

Main Menu

See All Actuators See All Combustion Engines See All Durability See All eDrive See All Production Testing Sensors See All Transmission & Gearboxes See All Turbo Charger See All DAQ Systems See All High Precision and Calibration Systems See All Industrial electronics See All Power Analyser See All S&V Hand-held devices See All S&V Signal conditioner See All Test Solutions See All DAQ Software See All Drivers & API See All nCode - Durability and Fatigue Analysis See All ReliaSoft - Reliability Analysis and Management See All Test Data Management See All Utility See All Vibration Control See All Acoustic See All Current / voltage See All Displacement See All Load Cells See All Pressure See All Strain Gauges See All Torque See All Vibration See All LDS Shaker Systems See All Power Amplifiers See All Vibration Controllers See All Accessories for Vibration Testing Equipment See All Training Courses See All Whitepapers See All Acoustics See All Asset & Process Monitoring See All Custom Sensors See All Data Acquisition & Analysis See All Durability & Fatigue See All Electric Power Testing See All NVH See All Reliability See All Smart Sensors See All Vibration See All Weighing See All Automotive & Ground Transportation See All Calibration See All Installation, Maintenance & Repair See All Support Brüel & Kjær See All Release Notes See All Compliance See All Our People
arrow_back_ios

Main Menu

See All CANHEAD See All GenHS See All LAN-XI See All MGCplus See All Optical Interrogators See All QuantumX See All SomatXR See All Accessories See All Accessories See All BK Connect / Pulse See All API See All Microphone Sets See All Microphone Cartridges See All Acoustic Calibrators See All Special Microphones See All Microphone Pre-amplifiers See All Sound Sources See All Accessories for acoustic transducers See All Experimental testing See All Transducer Manufacturing (OEM) See All Accessories See All Non-rotating (calibration) See All Rotating See All CCLD (IEPE) accelerometers See All Charge Accelerometers See All Impulse hammers / impedance heads See All Cables See All Accessories See All Electroacoustics See All Noise Source Identification See All Environmental Noise See All Sound Power and Sound Pressure See All Noise Certification See All Industrial Process Control See All Structural Health Monitoring See All Electrical Devices Testing See All Electrical Systems Testing See All Grid Testing See All High-Voltage Testing See All Vibration Testing with Electrodynamic Shakers See All Structural Dynamics See All Machine Analysis and Diagnostics See All Calibration Services for Transducers See All Calibration Services for Handheld Instruments See All Calibration Services for Instruments & DAQ See All On-Site Calibration See All Resources See All Software License Management
February 01, 2024 - Royston, UK 

HBK Celebrates Successful Launch of Solar Electricity at Royston Site

HBK is delighted to announce the successful activation of its solar electricity installation at the Royston site in the United Kingdom. The solar panels are now fully operational and will contribute up to 60% of the site’s energy requirements. The remainder of our electricity comes from renewable sources.

The journey to this achievement involved extensive coordination and collaboration between HBK, our landlord, and the solar installation team, spanning over a year.

Key statistics:

  • The installation boasts 845 solar panels
  • These panels generate approximately 340 kW peak power, equivalent to the energy needs of an HBK V994 shaker system at full capacity
  • Over the course of a year, the solar panels are expected to provide around 300 MWh of electricity, meeting up to 60% of the site’s total energy demands
  • Surplus energy, especially during periods of high supply and low demand, will either be used for charging electric vehicles at three designated points or sold back to the UK’s national grid

Dr Lawrence Grasty, HBK’s Director, Net Zero, extends his appreciation, “I’m absolutely delighted that our Royston facility is now substantially powered by solar electricity, and want to extend my thanks to all those who worked so hard to get us here, not least by ensuring that everyone worked safely on-site. Our company goal is to help the world become cleaner, healthier and more productive, by empowering customer innovation – and in this case, through how we ourselves operate. Well done!”

The Royston site joins Denmark as the second of HBK’s locations using locally generated solar power. Stay tuned for details on our upcoming third site, with more groundbreaking initiatives anticipated in 2024.

A video showcasing the installation process can be viewed here.

Related News

About HBK

Accelerate your product innovation with HBK solutions in virtual, physical and in-process testing.  From the electrification of mobility to the advancement of smart manufacturing, we support you throughout the entire product lifecycle, sharing your mission for a cleaner, healthier, and more productive world.