arrow_back_ios

Main Menu

See All Acoustic End-of-Line Test Systems See All DAQ and instruments See All Electroacoustics See All Software See All Transducers See All Vibration Testing Equipment See All Academy See All Resource Center See All Applications See All Industries See All Insights See All Services See All Support See All Our Business See All Our History See All Our Sustainability Commitment See All Global Presence
arrow_back_ios

Main Menu

See All Actuators See All Combustion Engines See All Durability See All eDrive See All Production Testing Sensors See All Transmission & Gearboxes See All Turbo Charger See All DAQ Systems See All High Precision and Calibration Systems See All Industrial electronics See All Power Analyser See All S&V Hand-held devices See All S&V Signal conditioner See All Test Solutions See All DAQ Software See All Drivers & API See All nCode - Durability and Fatigue Analysis See All ReliaSoft - Reliability Analysis and Management See All Test Data Management See All Utility See All Vibration Control See All Acoustic See All Current / voltage See All Displacement See All Load Cells See All Pressure See All Strain Gauges See All Torque See All Vibration See All LDS Shaker Systems See All Power Amplifiers See All Vibration Controllers See All Accessories for Vibration Testing Equipment See All Training Courses See All Whitepapers See All Acoustics See All Asset & Process Monitoring See All Custom Sensors See All Data Acquisition & Analysis See All Durability & Fatigue See All Electric Power Testing See All NVH See All Reliability See All Smart Sensors See All Vibration See All Weighing See All Automotive & Ground Transportation See All Calibration See All Installation, Maintenance & Repair See All Support Brüel & Kjær See All Release Notes See All Compliance See All Our People
arrow_back_ios

Main Menu

See All CANHEAD See All GenHS See All LAN-XI See All MGCplus See All Optical Interrogators See All QuantumX See All SomatXR See All Accessories See All Accessories See All BK Connect / Pulse See All API See All Microphone Sets See All Microphone Cartridges See All Acoustic Calibrators See All Special Microphones See All Microphone Pre-amplifiers See All Sound Sources See All Accessories for acoustic transducers See All Experimental testing See All Transducer Manufacturing (OEM) See All Accessories See All Non-rotating (calibration) See All Rotating See All CCLD (IEPE) accelerometers See All Charge Accelerometers See All Impulse hammers / impedance heads See All Cables See All Accessories See All Electroacoustics See All Noise Source Identification See All Environmental Noise See All Sound Power and Sound Pressure See All Noise Certification See All Industrial Process Control See All Structural Health Monitoring See All Electrical Devices Testing See All Electrical Systems Testing See All Grid Testing See All High-Voltage Testing See All Vibration Testing with Electrodynamic Shakers See All Structural Dynamics See All Machine Analysis and Diagnostics See All Calibration Services for Transducers See All Calibration Services for Handheld Instruments See All Calibration Services for Instruments & DAQ See All On-Site Calibration See All Resources See All Software License Management

Acoustic Test Rooms: Outsource or In-House?

In manufacturing testing is a fact of life. It must be done. The question is: How to go about it? Does the solution require an entire room or a cabin? In: Should testing be conducted in-house or should it be outsourced? 

For the past 20 years, Pro-Plan Ltd. has provided architectural and engineering services to support sound and vibration testing, including tailor-made, turnkey acoustic test rooms and cabins, on-site training and in-house testing.

Testing the Room
Ensuring that the test environment is correct is the first step to confirming the accuracy of the test data. For sound power and material testing, qualification procedures are given in accordance with relevant test codes. Tübitak UME (the Turkish National Metrology Institute) is generally contracted to verify the rooms.

For non-standard applications, the qualification specifications are agreed upon beforehand and Pro-Plan equipment is used to perform the tests.

Vist Website: Pro-Plan Ltd.

Test room under construction
Test room under constructionMany factors go into the decision-making process for testing, such as frequency of testing, repeatability of test types and the need for specialized testing.For example, acoustic rooms are required for well-defined and standardized measurements like sound power or material testing, whereas cabins are primarily for non-standard work like quality control and comparison tests.

For product manufacturers, benefits include reduced testing costs and times for testing variants of products and alterations made during research and development, as compared to outsourcing.

For testing houses, benefits would include increasing the range of test capabilities for items that a single company might test infrequently but many companies need, updating for compliance with standards or improving the quality of the test facility.

 



Testing the Test Room

Ensuring that the test environment is correct is the first step to confirming the accuracy of the test data. For sound power and material testing, qualification procedures are given in accordance with relevant test codes. Tübitak UME (the Turkish National Metrology Institute) is generally contracted to verify the rooms. For non-standard applications, the qualification specifications are agreed upon beforehand and Pro-Plan equipment is used to perform the tests.



Every Project Is Unique

In some cases, a single one-size-fits-all box solution may suffice, but few test items are the same, and even if they are similar, they can have very different test parameters. To properly test, the correct equipment is required, and that includes the environment to test. Pro-Plan has delivered more than 20 test rooms and chambers, and none of them is a duplicate: different test object size requirements, cut-off frequencies, background noise levels, installation areas and clear areas – each project is unique. “Many customers also do not know exactly what they should do and when we guide them through the process and suggest options during design, they are more than happy,” says Alper Akgül.

“Customers generally like the idea of working with a single supplier and getting a turnkey product.”
Alper Akgül, Pro-Plan Ltd., Turkey

There are also many alternative options for the equipment that, depending on the testing requirements, the optimum solution in terms of cost and capability can range anywhere from a single sound level meter with customized software to a multi-channel LAN-XI data acquisition system.The differences in the required complexity of the rooms, such as size, installation workspace, construction materials (panel or concrete), single- or double-shell (room within a room) system, auxiliary equipment (heat, ventilation and air conditioning (HVAC) systems, etc.) mean that construction time can take anywhere from 2 to 12 months and the cost is not insignificant. “We emphasize that acoustics are in the details, and you should get the job done right the first time. You cannot gamble with such an investment of money and time,” says Alper Akgül.

Test room completed
Test room completed

Value in The Details

The investment of capital and time is not insignificant, and the entire process, from the initial decisions up to the first test can require additional man-hours dedicated to determining the correct facilities, equipment and accessories. But in return, the convenience and time and money saved on having a complete and finished test room or chamber with the right testing capabilities and the training to use them – be they for expanding the services of a test hour or for in-house testing during product development – can be substantial.




Pro-Plan
Last year Pro-Plan completed a project for the Turkish Standards Institute (TSE). The project resulted in a double-reverberation room (side by side) plus a third room for testing ducted units with twin rooms, each with a volume of 250 m3.

It was a complicated project with a 15 dBA background noise level requirement on a noisy first floor, and the design incorporated many openings in the rooms (air inlet/outlet, water inlet/outlet, test duct and pressure equalization ductwork connections between rooms, cable passages, etc.).

The HVAC system (run from a different computer) also needed an interface, and the relevant temperature/humidity/pressure data had to be input to customized software. And because the customer was a test house, they required standard software interfaces for a variety of equipment types, such as fans, air conditioners, fan coils, washing machines, refrigerators, vacuum cleaners and heaters.

Outsource or in-house